They built this shower while it was wet. How stupid!
We removed the additional subfloor to see how bad the original subfloor was. As you can tell there wasn't anything wrong with the original subfloor. So we really don't know why they laid plywood on a good subfloor. Oh well, we got some extra ply wood out of it (smile).
Thankfully there wasn't any serious damage where they built the shower over wet everything! We let the wood dry and it was in strong, good shape.
No comments:
Post a Comment